Datacenter terms, in plain words.

The words that come up when you buy or sell capacity, explained without jargon. Every term links to itself, so you can share a definition.

Power and capacity

IT capacity
The power available to servers, storage and network equipment, in kilowatts (kW) or megawatts (MW). It excludes the power used for cooling and other building systems.
MW and kW
Units of power: 1 MW is 1,000 kW. Datacenter capacity is quoted as power rather than floor space, because power is usually the scarcer resource.
Rack density (kW per rack)
The power one rack can draw. Ordinary servers use a few kilowatts per rack; AI and GPU racks often need 40 kW or more, which takes suitable power distribution and cooling.
PUE (power usage effectiveness)
Total facility power divided by the power reaching IT equipment. A PUE of 1.0 would mean no overhead at all; the closer to 1.0, the more efficient the site.
Secured, applied and planned power
Secured power is contracted with the grid operator. Applied power has been requested and is waiting for a decision. Planned power has not been applied for yet.
Renewable power
Electricity from renewable sources such as hydro, wind or solar, supplied directly or matched with certificates of origin.
Heat reuse
Putting a datacenter's waste heat to use elsewhere, for example in district heating or industrial processes.

Cooling and resilience

Air cooling
Cooling equipment with chilled air moved through the hall, usually arranged in hot and cold aisles.
Rear-door heat exchanger
A water-cooled door on the back of a rack that removes heat from the air as it leaves the servers.
Direct liquid cooling (DLC)
Coolant piped to cold plates on the chips themselves. Common for high-density AI and GPU racks, where air alone is not enough.
Immersion cooling
Servers submerged in a non-conductive liquid that carries the heat away.
N, N+1, 2N and 2N+1
N is exactly the capacity needed, with nothing spare. N+1 adds one spare unit, so one component can fail. 2N duplicates everything, so either half can carry the full load. 2N+1 adds a spare unit on top of that.
Tier 1 to 4
A widely used classification of a datacenter's resilience, from basic capacity (Tier 1) to fault tolerance (Tier 4). Higher tiers add redundant power and cooling paths and allow maintenance without downtime.
ISO 27001, ISO 50001 and EN 50600
Common certifications: ISO 27001 covers information security management, ISO 50001 energy management, and EN 50600 is the European standard for datacenter facilities and infrastructure.

Sites and space

Colocation
Renting space, power and cooling in someone else's datacenter for your own equipment, from a few racks to whole halls.
Powered shell
A building with a grid connection and the basics in place, where the tenant designs and installs the data halls, cooling and racks.
Powered land
Land with a grid connection, secured or on the way, for building a new datacenter campus.
Datacenter offtake
A commitment to take capacity in a facility that is being built, often agreed before it is finished.
Ready date
When capacity can be handed over to the customer.
Site code
How AICapacity shows a site before both sides say yes, such as SE-1: the country and a number, never the name or exact location.

GPU compute

GPU compute
Access to graphics processors for AI training and inference, rented as servers or clusters rather than as space and power.
Bare metal
Whole physical servers dedicated to one customer, without a virtualisation layer in between.
Virtualised
GPUs offered through virtual machines running on shared physical hardware.
InfiniBand
A high-bandwidth, low-latency network often used to connect GPUs across servers for training.
RoCE
RDMA over Converged Ethernet: low-latency networking between GPUs over Ethernet, commonly at 100 or 400 Gb/s.

Deals on AICapacity

RFP (request for proposal)
A description of what you need, sent to suppliers so they can answer with an offer. On AICapacity it takes a few minutes and stays anonymous until you choose to engage.
Fit score
A score out of 100 for how well a site meets a request, field by field, weighted by what the operator says matters most. An operator's plan never changes it.
Both say yes
AICapacity's rule for names: the operator says it is interested, the buyer chooses to engage, and only then do both sides see who the other is.
NDA (non-disclosure agreement)
A contract that keeps shared information confidential. AICapacity offers a mutual NDA template both sides can start from.
LOI (letter of intent)
A document setting out the main terms both sides intend to agree, before the full contract is negotiated.
Success fee
The share of contract value an operator pays on contracts signed through AICapacity, partly at signing and partly over the first months.