Datacenter terms, in plain words.
The words that come up when you buy or sell capacity, explained without jargon. Every term links to itself, so you can share a definition.
Power and capacity
- IT capacity
- The power available to servers, storage and network equipment, in kilowatts (kW) or megawatts (MW). It excludes the power used for cooling and other building systems.
- MW and kW
- Units of power: 1 MW is 1,000 kW. Datacenter capacity is quoted as power rather than floor space, because power is usually the scarcer resource.
- Rack density (kW per rack)
- The power one rack can draw. Ordinary servers use a few kilowatts per rack; AI and GPU racks often need 40 kW or more, which takes suitable power distribution and cooling.
- PUE (power usage effectiveness)
- Total facility power divided by the power reaching IT equipment. A PUE of 1.0 would mean no overhead at all; the closer to 1.0, the more efficient the site.
- Secured, applied and planned power
- Secured power is contracted with the grid operator. Applied power has been requested and is waiting for a decision. Planned power has not been applied for yet.
- Renewable power
- Electricity from renewable sources such as hydro, wind or solar, supplied directly or matched with certificates of origin.
- Heat reuse
- Putting a datacenter's waste heat to use elsewhere, for example in district heating or industrial processes.
Cooling and resilience
- Air cooling
- Cooling equipment with chilled air moved through the hall, usually arranged in hot and cold aisles.
- Rear-door heat exchanger
- A water-cooled door on the back of a rack that removes heat from the air as it leaves the servers.
- Direct liquid cooling (DLC)
- Coolant piped to cold plates on the chips themselves. Common for high-density AI and GPU racks, where air alone is not enough.
- Immersion cooling
- Servers submerged in a non-conductive liquid that carries the heat away.
- N, N+1, 2N and 2N+1
- N is exactly the capacity needed, with nothing spare. N+1 adds one spare unit, so one component can fail. 2N duplicates everything, so either half can carry the full load. 2N+1 adds a spare unit on top of that.
- Tier 1 to 4
- A widely used classification of a datacenter's resilience, from basic capacity (Tier 1) to fault tolerance (Tier 4). Higher tiers add redundant power and cooling paths and allow maintenance without downtime.
- ISO 27001, ISO 50001 and EN 50600
- Common certifications: ISO 27001 covers information security management, ISO 50001 energy management, and EN 50600 is the European standard for datacenter facilities and infrastructure.
Sites and space
- Colocation
- Renting space, power and cooling in someone else's datacenter for your own equipment, from a few racks to whole halls.
- Powered shell
- A building with a grid connection and the basics in place, where the tenant designs and installs the data halls, cooling and racks.
- Powered land
- Land with a grid connection, secured or on the way, for building a new datacenter campus.
- Datacenter offtake
- A commitment to take capacity in a facility that is being built, often agreed before it is finished.
- Ready date
- When capacity can be handed over to the customer.
- Site code
- How AICapacity shows a site before both sides say yes, such as SE-1: the country and a number, never the name or exact location.
GPU compute
- GPU compute
- Access to graphics processors for AI training and inference, rented as servers or clusters rather than as space and power.
- Bare metal
- Whole physical servers dedicated to one customer, without a virtualisation layer in between.
- Virtualised
- GPUs offered through virtual machines running on shared physical hardware.
- InfiniBand
- A high-bandwidth, low-latency network often used to connect GPUs across servers for training.
- RoCE
- RDMA over Converged Ethernet: low-latency networking between GPUs over Ethernet, commonly at 100 or 400 Gb/s.
Deals on AICapacity
- RFP (request for proposal)
- A description of what you need, sent to suppliers so they can answer with an offer. On AICapacity it takes a few minutes and stays anonymous until you choose to engage.
- Fit score
- A score out of 100 for how well a site meets a request, field by field, weighted by what the operator says matters most. An operator's plan never changes it.
- Both say yes
- AICapacity's rule for names: the operator says it is interested, the buyer chooses to engage, and only then do both sides see who the other is.
- NDA (non-disclosure agreement)
- A contract that keeps shared information confidential. AICapacity offers a mutual NDA template both sides can start from.
- LOI (letter of intent)
- A document setting out the main terms both sides intend to agree, before the full contract is negotiated.
- Success fee
- The share of contract value an operator pays on contracts signed through AICapacity, partly at signing and partly over the first months.